Stormwater Improvement Projects

The Town of Harrisburg Stormwater Department is building a dry detention pond at Highway 49 and School Avenue. The detention pond will detain runoff from some rain events that have historically flooded adjacent downstream neighborhoods (School Avenue, Parallel Drive and Autumn Drive). The pond will allow the runoff to drain from the site at a more predictable, gradual rate. The estimated project cost is $130,000 and anticipated completion is late fall 2015.