Sequoia Hills Dr Water Main Expansion

This project is currently under construction, anticipated completion December 2022.

This project will install 1,915 linear feet of new water line along Sequoia Hills Dr, an area within Town limits that is not currently serviced by the public water system. This project provides the availability of water service and fire protection to residents along Sequoia Hills Dr. Additionally, this project will replace a failing stormwater culvert under Sequoia Hills Dr with a new 48-inch reinforced concrete storm drain pipe, with concrete headwalls.