FY 2021 Waterline Improvements

This project will replace approximately 4,000 linear feet of thin-walled PVC and small diameter water line pipes that remain throughout portions of the old system, mostly located in the oldest portions of the down town area. Replacing existing lines with 6 inch lines and adding fire hydrants will provide additional fire protection. Wok will occur on Woodside Drive and School Avenue. Engineering Design is currently underway by Black and Veatch and the project is expected to be bid in January 2022.